Our Work

brent@tomballplumbing.com
Phone 713 815-4848

Plumbing waste and vent for 3 added back outlet toilets. Avoided breaking slab.

Plumbing waste and vent for 3 added back outlet toilets. Avoided breaking slab.

1st of 3 pressure assist toilets connected to new plumbing system.

1st of 3 pressure assist toilets connected to new plumbing system.

underground 25 ft

25 foot tunnel under house to replace old broken cast iron drains under house with Schedule 40 PVC.

Code approved plumbing drain for water treatment discharge backwash cycle.

Code approved plumbing drain for water treatment discharge backwash cycle.

Example of secure stub out brackets for PEX repipe.

Example of secure stub out brackets for PEX repipe.

installation-of-toilet-drains-finished

Finished installation of drains for 3 added toilets in commercial building.

New bathtub installed. Remodel.

New bathtub installed. Remodel.

Slab leak repairs. Support hangers into bottom of slab every 4 feet to code.

Slab leak repairs. Support hangers drilled into bottom of slab every 4 feet per code.

Whole house water treatment system in garage. Water softener and carbon filter.

Whole house water treatment system in garage. Water softener and carbon filter.

Saw cut concrete and installation of sewer drains for 3 added toilets in commercial building

Saw cut concrete and installation of sewer drains

install-Whole-house-generator

Whole house generator installation

New water heater install with pan, drain, vent, and all new connections.

New water heater install with pan, drain, vent, and all new connections.