Our Work
brent@tomballplumbing.com
Phone 713 815-4848
Plumbing waste and vent for 3 added back outlet toilets. Avoided breaking slab.
1st of 3 pressure assist toilets connected to new plumbing system.
25 foot tunnel under house to replace old broken cast iron drains under house with Schedule 40 PVC.
Code approved plumbing drain for water treatment discharge backwash cycle.
Example of secure stub out brackets for PEX repipe.
Finished installation of drains for 3 added toilets in commercial building.
New bathtub installed. Remodel.
Slab leak repairs. Support hangers drilled into bottom of slab every 4 feet per code.
Whole house water treatment system in garage. Water softener and carbon filter.
Saw cut concrete and installation of sewer drains
Whole house generator installation
New water heater install with pan, drain, vent, and all new connections.